Wednesday, July 17, 2019

Application of the Top-Down Network Design Methodology

1. What atomic number 18 the business goals? (10 points) The goals of the business are to take a shit a unused entanglement that could animation the gro fender number of students at the campus and to cause a way for collide with campus students to overture the network.2. What are the business constraints? (10 points) The constraints on the partnership are that the budget consists of revenue from spot taxes and a previously approved bond, so with the network now needing to be bigger and more accessible the money from the bonds may not be enough to addition the project.3. What are the expert goals? (10 points) The technical goals of the attach to are to*Build a in the buff IT wing for the administration building so that all of the servers can be alter *Connect all of the buildings to the new IT wing *Provide tuner access to the students in their classrooms *Provide wireless access to students off campus *Provide a high-speed wireless spliceion for the faculty *Provid e a centralized online backup for student and faculty documents *Replace the PBX based phone organisation with a new VoIP system4. What are the technical constraints? (10 points)The one big issue that is a technical constraint on the lodge is that due to the rising number of students, the discipline is planning on needing another campus location- which is expect to be about 15 miles away. Creating a wireless network for the new campus to connect to the original campus will cause issues when it is completed. firearm the new building has been approved for funding, the new addition on the network has not.5. diagram the existing network. (10 points)6. Describe the existing network traffic. (10 points)7. Complete this table for all of the applications that before long run over the network. (10 points)

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.